Our work
Recent oil tank installations
Real jobs completed by our own engineers. Follow each installation from the first groundworks or old-tank removal through to the finished bunded tank.

Recent job 1
Raised bunded tank installation
A new slab foundation and blockwork plinth built from scratch, followed by the installation and connection of a green bunded tank.




Recent job 2
Before and after: tank replacement
The old tank was emptied and disconnected before a new bunded tank was installed on a larger, compliant slab base.


Recent job 3
Garden installation on a new slab base
A complete groundworks sequence, from excavating and levelling the new position to laying the slabs and installing the bunded tank.





Recent job 4
Raised plinth tank installation
A six-stage installation showing the cleared site, compacted sub-base, slab foundation, blockwork plinth and completed black bunded tank.






Get a free, no-obligation site survey
An OFTEC registered engineer will inspect your tank, base and oil line, then give you a fixed written quote for the whole job. The survey costs you nothing and you are under no obligation to book the work.